Waiting to berth and to sail
Queues at anchorage, missed windows, documents not cleared in time. For rigs and platforms, waiting at each end of the call can run into days.
Ship agency · Rio de Janeiro · operating from March 2027
A drilling rig waiting, a tanker staying longer than normal, a ship idle at anchor. Southgate handles the port call, plans every maneuver with the pilots and the terminal, and measures the time from anchorage to sailing. The variable part of our fee applies only to proven savings.
Illustration. The orange part is the time above what similar ships take in the same port: that is where we measure and act.
Orders of magnitude, estimated by Southgate from vessel time in Brazilian ports in 2026 and market day rates. Not contractual demurrage.
Where a port call loses money
What weighs on a port call is time. Every extra day at anchor or at berth costs the ship's day rate, and a maneuver that runs past the planned time moves to another band of the pilotage tariff.
Queues at anchorage, missed windows, documents not cleared in time. For rigs and platforms, waiting at each end of the call can run into days.
Operations slower than at the same berth for the same type of ship, with no one comparing against normal.
When a maneuver runs past the time included in the pilotage tariff, the bill goes up. With platforms and FPSOs, every hour counts.
Items outside the official tariff of the contract; pilotage, towage and port invoices nobody checks line by line.
Market orders of magnitude. Each step is ten times the one before.
What Southgate does for you
We work for shipowners, charterers, rig and platform operators, cargo owners and traders. Each service can be hired on its own.
Port call, documents and clearances (Harbour Master, health, customs, federal police, ANTAQ) and the bill checked line by line against each contract's official tariff.
You pay what the contract says, and nothing more.
Drilling rigs, platforms, FPSOs, heavy lift and project cargo barges, from D-90 to D-0, with a single point of responsibility.
Fewer idle days at each end of the call.
We measure the call against the normal for the berth and terminal. The variable part of the fee applies only to verified savings.
We gain only when you do.
Calculation, claims and defense, backed by the time record of every event of the call.
Claims with evidence, settled faster.
If you already have an agent: we check the bill against the official tariff and the time against the berth's normal.
A second opinion on every call.
Berth, window, draft, restrictions, deadlines and expected cost, before you fix the ship.
Chartering decisions with the real port cost.
Also: protecting agency, husbandry (crew, spares, supplies) and customs clearance.
Special maneuvers with minimum error
A special maneuver brings together the Harbour Master, pilots, terminal, port authority, engineering, insurance, the environmental agency (Ibama), customs, health and federal police. Southgate answers for the whole set, from planning to the post-operation audit.
Deadlines: NPCP-RJ (3rd revision, Dec 2025), NORMAM-204 and Ibama rules for the Basel Convention.
Efficiency with pilotage
The maneuver is the most expensive and sensitive moment of the call. We work with the pilots, the terminal and the tugs so it happens in the right window, within the planned time and with the paperwork ready.
Maneuvers booked when berth, tide, draft and bar conditions allow. Fewer cancellations and rebookings.
A maneuver plan that finishes within the time included in the tariff, with nothing charged separately.
We follow the pilots' schedule and your ship's AIS: you know your place in the queue and hear about changes early.
No-objection, Notice to Mariners, tow plan and clearances ready before each authority's deadline.
Every pilotage and towage charge checked against the zone's official tariff in force.
A team that understands maneuvers: requests reach the pilots complete, with ship data and berth restrictions.
The pilotage tariff includes a set time for each maneuver; anything beyond it is charged separately, and with platforms and FPSOs every hour weighs. We plan window, tide, tugs and a ready berth so the maneuver finishes within the included time.
How it works
Berth, window, draft, authority deadlines and expected cost. Documents and clearances filed on time.
Pilot schedule and AIS tracked; delay alerts before they turn into cost. One 24-hour contact.
Time of each stage against the berth's normal, the bill checked against the official tariff and, under a performance contract, the verified savings.
2027
Southgate is being set up and starts operating in March 2027, based in Rio de Janeiro. Those who plan their port calls and special projects now reach March with the window, the deadlines and the cost already worked out.
A conversation about your 2027 port calls and projects: berth assessment, window, authority deadlines and expected cost.
Agency in Rio, Sepetiba, Angra and Açu, a remote technical desk for other ports, and port call audits.
Special projects from D-90 to D-0, performance-based calls and laytime, with the time of every call measured.
We start operating in March 2027. Send us the call or project you have ahead now: we reply with the window, each authority's deadlines and the expected cost.
Rio de Janeiro, Brazil · serving all of Brazil